| OCR Text |
Show Comments: Sampling Plan for Kennecott Tailings Pond Introduction 1. include a discussion of target popula ground water, surface water and air Also, provide a brief discussion of human migration pathways. populations potentially exposed due to direct contact. The Sampling Plan should associated with tions Objectives 2. objectives of the Sampling Plan is to "determine tailings pond is affecting the ground water flow direc tion". However, no mention is made in the Sampling Plan of how this will be accomplished. One of the if the Background 3. complete discussion of potential contribution of contaminants nearby "unrelated" sites (other tailings ponds, evap oration ponds, landfills, etc.) should be provided. A from any 4. The text mentions under CERCLA". By What conclusions 5. a "preliminary evaluation was also done When? whom? were What type of report was generated? made? It should be mentioned in the text that the Great Salt Lake the receptor of NPDES permitted discharge water. is Site 6. Geology and Hydrology Subsurface geology of the The "Site Geology" section tailings pond area is important. should be expgnded to include geologic characterization of lithology including strata permeability, age, thickness, etc. Figure 2 7. Please legend defining NPDES discharge locations, "P.S.", explanation of sample codes (Le. ground water, sediment, etc.). provide and a an 8. Indicate the location of pond effluent pipes. 9. Where do the canals the site 10. Lee and depicted near originate? Kersey Creeks should be identified on the Figure in Attachment 13. in Figure 2, as |