| OCR Text |
Show Kennecott Utah Copper Corporation PLANT PROJECTS GROUP 8400 West 1 0200 South P. O. Box 112 Bingham Canyon, Utah 84006-0112 (801) 569-6810 FAX (801) 569-6854 Kennecott March 03, 1999 Ms. Erna Waterman On-Scene Coordinator EPA Region VIII 999 18th Street, Suite 500 Denver, Colorado 80202-2405 \, o (.r .' , c= r: ',J.J :.,,:: '.f .,:." :,.;:;; f , C:) Kennecott Utah Copper Corporation North Facilities Soils and Wastewater Treatment Plant Ponds Site Removal Action ssm #4B Docket No. CERCLA VIII 95-04 Project: - - - - ',_ ":' .. ex:; :.::] 1:;-:.., -"IJII """"- (-") .' . t j -'1) :_.:: b - .! • 1', ,,) t',) Project Status Report for the monthly period ending March 03, 1999 Subject: Dear Ms. Waterman; In accordance with the North Facility Soils and Wastewater Treatment Plant Ponds Administrative Order Consent and pursuant to Sections 104(a) and 122(a) of CERCLA, Kennecott is submitting the following report. As agreed, Kennecott will submit these reports monthly and not bi-weekly as described in paragraph 41 of the AOC. Bi-weekly reporting will resume as dictated by the work schedule. on 1. Construction Activities Ontario Specialty Contracting Smelter Demolition Contractor Continued demolition work on the Hot Metals Material Handling Facility. - Atlas Steel Processing steel removed from the Hot Metals Material Handling Facility. Harper Contracting, Inc. WWTP Sludge Removal Contractor Screened and placed a total of 71,309 sq/yd of sand in the Repository as the protective layer. (0 sq/yd during this reporting period) - * Excavated and placed a total of 145,842* cy of sludge from Pond A to the Repository (The excavation of Pond A is complete) Excavated and placed a total of 128,828 cy of sludge from Pond B to the Repository. (The excavation of Pond B is complete) Excavated and placed a total of 310,690 cy of sludge from Pond C to the drying/staging pad. (The excavation of Pond C is complete) Excavated and placed a total of 77,101 * cy of sludge from Pond C Extension to the drying/staging pad. (The excavation of Pond C Ext. is complete) Placed a total of 452,856* cy of dried sludge into the Repository from the drying/staging pad. (0 cy during this reporting period) Continued water removal from Pond D. Excavated and hauled 12,288 cy of clean Pond D dike material to the Slag Pile Footprint. (3,890 cy during this reporting period) Completed the reclamation of Pond C and Pond C Extension Footprint. Adjusted volumes from 1998 topographic survey. |