| OCR Text |
Show area source the includes characterizing required sufficient includes and it geologic, contamination, obtaining and geotechnical hydrologic information to design and If construct the appropriate landfill for on-Site disposal. off-Site disposal is necessary, then it shall be consistent with section III.C below. Existing data that are valid and of It also useable sufficient. be requires quality may the with consistent action the CERCLA, implementing response Work NCP and this Order. Respondent shall prepare and submit for EPA approval a Plan describing in detail how the Respondent shall implement the removal action, how the work will be performed, removal and as such action criteria depth of response treatment as methods appropriate, schedules and personnel Landfill a In addition, Design and responsibilities. The Work EPA will Construction Specifications report will be required. the Removal action an Memorandum Action prepare specifying selected for the Site. ,. Site plan shall be prepared by the the conducted by the Respondent, contractors and during representatives of work. Health & Safety for activities Respondent A Respondent's implementation III. REMOVAL WORK PLAN The Respondent shall pr'epa re and submit a draft Work Plan within 45 days of the effective date of the Order. The work plan must include at a minimum the following elements: A. SELECTED RESPONSE ACTION Describe the response action with a short overview of the tasks required to implement the Removal. A schedule of activities must also be included. B. MATERIALS HANDLING AND STORAGE Methods of rnat.e r i.a La handling for contaminated soils, clean soils, and stabilized soils (if required) must be This section shall described. include methods. and for demolition, excavation, transportation on equipment Site, stockpiling, and final placement of (if required). Maps depicting haul work areas etc. shall be areas, stockpile temporary stabilized material routes, I I provided. C. DISPOSAL If an FACILITY off-Site response (Off-Site or On-Site) disposal facility is the plan shall action, 3 a requirement list the of name the and |