| OCR Text |
Show '**'arfiMEMHflu$ tuflnwnmww ‘ 1f}‘Qfi'lwi-JJH' I SPECIALMEETiNG Nevember let; 1; A Special meeting of the Board of Regents of the; University of Utah wa.s held in the Directors‘ room of Q Deseret National Bank at 1:00 p. m., Monday, November 1 Chairman Riter and Regents Van Cott, King Present, bury, Bamberger, Gemmell, Young, Williams, and Porter,1 The meeting was called especially to Open and beds J Pipe Line bids for the construction of a cast iron pipe line thrd§y Federal Heights to connect with the University hydralim laboratory. The bids were opened by Regent Williams? by Regent Young. They were found to be as follows¢_‘i BIDDER, PIPE, Per Foot. EXCAVATING & FILLIfl Per Cu. Yd.tw ' James Kennedy, $2.85 ' ‘$ 146 P. J. Moran, 3.67 .60 Griffith & Martin, 3.27 .65 G. n. Gest, 3.25 1.15 1 F. D .Hill, 5.09 .50 ‘ R.J. Cheney, 3.07 1.00 contract was, . I'- W-«JK-I? [m .37.} As Mr. Kennedy was the lowest responsible biddéT on motion of Regent Bamberger, aqardefi | A w H"\‘-z. .1 _<'. 1.: 4 1E_ - ' The Secretary was directed to return the certifiedy to the other bidders. ‘Printing listerson bfifluttall Barton EJBeynolds FL. John Nuttall, Cedar City. Jr" in SpanishfiLU 'g' |