OCR Text |
Show APPENDIX XIV XIV-21 (1) act as liaison between both the Secretaries of Interior and Agriculture and the Administrator of the Environmental Protection Agency and the States in accomplishing the purposes of this title; (2) receive reports from the Secretary on the progress of the salinity control program and review and comment on said reports; and (3) recommend to both the Secretary and the Administrator of the Environmental Protection Agency appropriate studies of further projects, techniques, or methods for accomplishing the purposes of this title. SEC. 205. (a) The Secretary shall allocate the total costs of each unit or separable feature thereof authorized by section 202 of this title, as follows: (1) In recognition of Federal responsibility for the Colorado River as an interstate stream and for international comity with Mexico, Federal ownership of the lands of the Colorado River Basin from which most of the dissolved salts originate, and the policy embodied in the Federal Water Pollution Control Act Amendments of 1972 (86 Stat. 816), 75 per centum of the total costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof shall be nonreimbursable. (2) Twenty-five per centum of the total costs shall be allocated between the Upper Colorado River Basin Fund established by section 5 (a) of the Colorado River Storage Project Act (70 Stat. 107) and the Lower Colorado River Basin Development Fund established by section 403 (a) of the Colorado River Basin Project Act (82 Stat. 895), after consultation with the Advisory Council created in section 204(a) of this title and consideration of the following items: (i) benefits to be derived in each basin from the use of water of improved quality and the use of works for improved water management; (ii) causes of salinity; and (iii) availability of revenues in the Lower Colorado River Basin Development Fund and increased revenues to the Upper Colorado River Basin Fund made available under section 205(d) of this title: Provided, That costs allocated to the Upper Colorado River Basin Fund under section 205 (a) (2) of this title shall not exceed 15 per centum of the costs allocated to the Upper Colorado River Basin Fund and the Lower Colorado River Basin Development Fund. (3) Costs of construction of each unit or separable feature thereof allocated to the upper basin and to the lower basin under section 205 (a) (2) of this title shall be repaid within a fifty-year period without interest from the date such unit or separable feature thereof is determined by the Secretary to be in operation. (b)(l) Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof allocated for repayment by the lower basin under section 205 (a) (2) of this title shall be paid in accordance with subsection 205(b)(2) of this title, from the Lower Colorado River Basin Development Fund. (2) Section 403 (g) of the Colorado River Basin Project Act (82 Stat. 896) is hereby amended as follows: strike the word "and" after the word "Act" in line 8; insert after the word "Act," the following "(2) for repayment to the general fund of the Treasury the costs of each salinity control unit or separable feature thereof payable from the Lower Colorado River Basin Development Fund in accordance with sections 205(a)(2), 205(a)(3), and 205(b)(l) of the Colorado River Salinity Control Act and"; change paragraph (2) to paragraph (3). (c) Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof allocated for repayment by the upper Costs, allocation. 43 USC 1595. 33 USC 1251 note. 43 USC 620d. 43 USC 1543. Costs, limitation. Construction costs, repayment. 43 USC 1543. |