OCR Text |
Show Contractor Privately Owned Utilities Cal-Pacific Utilities Co.-802 Citizens Utilities Co. (Total)-991 Hilltop Nogales Parker Switchyard Black Mesa Total Projects Not Engaged in Electric Operations (Reclamation Project Loads) Yuma Projects CRFW Drainage Pumps CRFW Saline Pumps S.G.V. Drge. Wells S.W. P.G. Plant YM&YV Drge. Wells Gila Project WM Div. Drge. Wells (Delivery of Water to Mexico) SGV Drainage Wells Total Other Public Authorities Dept. of Army (Yuma Proving Gd) 2636 Edwards Air Force Base (Total) 2629 Blythe Mead Total Domestic Coolidge, Mesa, Tucson, (Res.) Davis Camp (Gov. Employees) Davis Camp (Non-Gov. Employees) Parker Camp (Gov. Employees) Parker Camp (Non-Gov. Employees) Total In terdepartmental Used by the United States Camp Lights (Davis Dam) Camp Lights (Parker Dam) Headquarters Area Lighting CHAPTER III 73 INCOME Energy Mills Sales Net Net Per kWh Amount kWh 28,274,400 178,128 .60 6.30 71,551,515 452,062 .11 6.32 39,770,100 21,540,500 3,435,100 6,805,815 99,825,915 630,190 .71 6.31 1,828,241 8,760.42 4.79 1,344,009 6,696.92 4.98 2,166,738 9,483.77 4.38 9,068,000 55,522.50 6.12 14,392,557 75,020.41 5.21 3,677,640 16,449.10 4.47 1,225,741 3,846.10 3.14 33,702,926 175,779.22 5.22 20,826,652 149,672.88 7.19 89,118,400 564,072.85 6.33 83,182,400 5,936,000 109,945,052 713,745.73 6.49 90,268 511.39 5.67 477,117 3,398.70 7.12 250,080 1,784.13 7.13 382,164 2,699.36 7.06 550,580 3,867.84 7.03 1,750,209 12,261.42 7.01 150,094 1,067.77 7.11 486,685 1,474,900 9,037.53 6.13 |