OCR Text |
Show APPENDIX I 1-13 1B.6 BOULDER CANYON PROJECT ACT [Public-No. 642-70th Congress] [H. R. 5773] AN ACT To provide for the construction of works for the protection and development of the Colorado River Basin, for the approval of the Colorado River compact, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That for the purpose of controlling the floods, improving navigation and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior, subject to the terms of the Colorado River compact hereinafter mentioned, is hereby authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is hereby authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water or for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or cause to be constructed, a complete plant and incidental structures suitable for the fullest economic development of electrical energy from the water discharged from said reservoir; and to acquire by proceedings in eminent domain, or otherwise, all lands, rights-of-way, and other property necessary for said purposes. SEC. 2. (a) There is hereby established a special fund, to be known as the "Colorado River Dam fund" (hereinafter referred to as the "fund"), and to be available, as hereafter provided, only for carrying out the provisions of this Act. All revenues received in carrying out the provisions of this Act shall be paid into and expenditures shall be made out of the fund, under the direction of the Secretary of the Interior. (b) The Secretary of the Treasury is authorized to advance to the fund, from time to time and within the appropriations therefor, such amounts as the Secretary of the Interior deems necessary for carrying out the provisions of this Act, except that the aggregate amount of such advances shall not exceed the sum of $165,000,000. Of this amount the sum of $25,000,000 shall be allocated to flood control and shall be repaid to the United States out of 62V2 per centum of revenues, if any, in excess of the amount necessary to meet periodical payments during the period of amortization, as provided in section 4 of this Act. If said sum of $25,000,000 is not repaid in full during the period of amortization, then 62V2 per centum of all net revenues shall be applied to payment of the remainder. Interest at the rate of 4 per centum per annum accruing during the year upon the amounts so advanced and remaining unpaid shall be paid annually out of the fund, except as herein otherwise provided. |