| OCR Text |
Show We have paid from General Maintenance funds for the Anatomical Laboratory; the Auto Laboratory: the building for the line electricians, the garage, etc.,etc., etc. The accounts with the three main buildings stand Ias follows: Wm. M. Stewart Training School $82,680.66 i Medical School Building Dining Hall 62,292.91 & 44,046.36 ‘11" i 9 9 l TBuilding,Resources Appropriations for Educational B1. 55,000.00 War Loan from State 60,000.00 Allowed for New Construction "by War Department 78 660.60 3 fl Wren P n3BuildingVSummary 9 Costs 189,020.25 Resources 195 660.60 $ 4,610.57 FINANCIAL MEMORANDUM, 1918-19. Max 1919. l. Assume no credit from General Maintenance, July 1, 1919. ii 2. Refund from Governor's Supplementary Budget for items I\ A paid from General Maintenance Fund: New Connections with City Water system 900 Sewer connections 1,000 Heating tunnels 6,500 Gas and steam'pipes 2,400 Electrical Conduits 2,500 Rewiring mining building 400 Total, 13,700 Available from S. A.T. C. Transactions: Amount due . 102,572.57 Liabilities . 77,095.23 vAllowance for New Construction, (78,660.60 less 4,640.57) $74,020.25 Dining Hall Equipment, ‘ Book Store, Net Available, 2,175.00 900.00 $25,277.54 |