OCR Text |
Show 4926 Cleary- C 2939 A No sir; absolutely not. Q You say " P" means " preliminary" on your maps? MR. FARNSWORTH: I notice counsel nodded. We have other engineers present to whom it may be as strange as to counsel. BY MR. FARNSWORTH: Q " P" means preliminary, does it? A It does in engineering, in the Rocky Mountain region over. Q Did you make estimates of cost? A Yes sir. Q From just your preliminary survey? A Yes sir. Q Was the pipe line survey made before or after your survey? A That sketch of the pipe line was made before, to avoid a filing in the Land Office, here. Q Was the actual pipe line survey made before or after your survey? A There was no actual pipe line survey made, to my knowledge, by me or my department, outside of the recognizance. Q You are sure this shows the pipe line survey that you made? A Absolutely sure. Q It was quite important, wasn't it, to see whether it |