OCR Text |
Show 2. Chemistry ,." . • •' ..• • ' : . :' • . • Current Situation ( CS) Alternate Alternative B Alternative C 2.2 Account for the locations and quantities of salts in the GSL system N arm, west desert and mineral extraction pond facilities. Feasibility/ Effectiveness Has contributed to dispute over ownership of salt in West Pond. Methodology would have to be developed for sequestered areas. Monitoring program costs would need to be determined. Same as A. Same as A. Possible Impacts Limits ability' to influence salinity if we choose to do so. Slightly enhanced ability to influence salinity', if we choose to do so. Same as A. Same as A. Conflicts/ Coordination NA Will require extraction industries to participate. Same as A. Same as A. Public Trust/ Protection Uncertainty over locations and quantities of slat somewhat limits reclamation planning. Can enhance reclamation planning. Same as A. Same as A. 183 |