OCR Text |
Show 10.2 Open specific areas of the lake for commercial harbors for the brine shrimp industry. CS. Permitted sites at AISP, Promontory Point and Stansbury Island and unpermitted sites at Rozel Point, Black Mountain, Little Valley, Magcoip and Lakeside. Black Rock is in the permitting process. Limit availability of Antelope Island State Park Marina for use as a brine shrimp harbor. A. Identify and open areas ( zone) around the lake for brine shrimp harbor development in the north and south arms of the lake and maintain existing policy regarding no exclusive use ( also open for other brine shrimp companies). North Arm- Little Valley, Rozel Point and Black Mountain/ South arm- Black Rock, Lakeside, Promontory Point, Stansbury Island, Magcorp. Limit availability of Antelope Island State Park Marina for use as a brine shrimp harbor. B. Same as A, except only use Little Valley for a north arm brine shrimp harvesting harbor. Limit availability of Antelope Island State Park Marina for use as a brine shrimp harbor. C. Change DNR policy to allow exclusive leases for individual brine shrimp companies. Respond to proposals on a case- by- case basis. 10.3 Establish policy regarding unauthorized construction below meander line for the development of harbors, ramps or any other structures. CS. Use current trespass policy. Allow flexibility in the current trespass policy which requires a damage liability of three times the cost of permit ( 65A- 3- l( 2)). A. Link a specific enforceable penalty to other DNR permits, licenses and applications. Under this alternative, DNR agencies would decide which permits would be linked together to encourage compliance with rules. B. Same as A. C. Same as CS. 171 |