OCR Text |
Show Current Situation ( CS) 1. Hydrology Alternative A Alternative B Alternative C 1.1 Define GSL flood plain for planning purposes. Feasibility/ Effectiveness Possible Impacts Conflicts/ Coordination 1995 plan recommends BDA below 4217, but not fully implemented at the local level. Different flood plain boundary lines for different entities. DNR's definition of flood plain is not intended to preempt the regulatory role of COE, FEMA and local government. Based on the recent highest historical lake level 4212 plus 5 ft. of wind tide and wave action. Effectiveness depends upon local zoning, COE and FEMA flood plain mapping. They would not necessarily agree with DNR's demarcation. Possible perceived conflict with private property rights. Same as CS. Same as A. Same as A. Same as CS. Effectiveness depends upon local zoning, COE and FEMA flood plain mapping. They would not necessarily agree with DNR's demarcation. Same as A, except use 4212 elevation. Same as CS. Public Trust/ Protection On DNR land resources are protected through combination of flood plain designation and sovereign lands classifications. If local planning and zoning agree with DNR, provides the greatest level of protection of public trust resources considering recent highest historical lake level. Same as A. If local planning and zoning agree with DNR, provides a relatively lower level of protection of public trust resources considering recent highest historical lake level. 176 |