| OCR Text |
Show ~1r. ~~,ge Richard iHbley 2 December H, 1973 2. The approximate date when work sould start on the project if funds are approved. 3. The specifications and plans for the project, which have been requested by the National Park Service. 4. The description of work \'1hich was SUbfilittc: d in the $25,000 re- quest for the Eph raim United Order Cooperative 8uildin g is as follows: "Replace and stabilhe roof to prevent further deterioration, stabilize weakening structure with tie rods and other necess a ry measures, restore windows to ot'iginal condition by renoval of bricks, exterior work to restore building to its ori 9i na 1 hi s tori c appearance. " If the i~; overnor IS tevi ew commi ttee apprf,ves all or part of your reques t , the plans, s j)ecificati ons. etc., will be i nuled i ate ly forwarded to the National Pa rk Service for their filial approval before any authorization of work unde r the grant takes pl ace . In the :;'lGftn ti !lle, ~"e wou l d <lPp r eci:lte very i;,uch you r r eturn i n(] the enclosed post card i nforr:1in ~J us i f YOLI ar c sti 11 i nterested i n obtaining the grant. If you have any questi ons pl ea s e contact th e Dreservation Planninu Office at 328- 5755. You rs Sin ce re 1y • i:ent Powell Preservation liistor1an cb En c1 osures |