| OCR Text |
Show sanpete Development Corporation -3- June 5, 1969 e xtent of truss strengthening in the form of tension members, and even their locations, will have to wait upon further inspection and measurements and up on your decision as to how much, if an~ of the present bin and chute structure should be removed to improve pedestrian acc es s around the second floor area. In any event, necessary connections will not be difficult to accomplish. (1) First and second floor construction appears to De adequate as built, subject to further detailed inspectioil~ The' · supports for each must be checked against any relocation you may have in mind for the intended use of each floor. (m) The exterior "TalIs appear to be in good condition and without evidence of differential foundation settlement. It will probably be unnecessary to install viall ties, but final determination of their necessity should wait upon further inspection. Brother Nibley, I will await your further instruct.ions. Assuming you proceed with the work, there is certain additional information you \vill need in the form of sketches of connections Vlhich have not yet been deSigned. And there are many dimensions needed, most if not all of which you can determine yourself in advance of another trip to the site. If you decide to not proceed vlith the work, may I assume that an invoice for consulting engineering services to date should be addressed to Sanpete Development Corporation? |