OCR Text |
Show avoided and the back filling shall be so done as not to increase the cost of future dredging for navigation. If the material is to be deposited in the harbor of New York, or in its adjacent or tributary waters, or in hong Island Sound, a permit therefor must be previously obtained from the Supervisor of New York Harbor, Army Building, New York City. 5. That there shall be no unreasonable interference with navigation by the work herein authorized. (i. That if inspections or any other operations by the United States are necessary in the interests of navigation, all expenses connected therewith shall be borne by the permittee. 7. That the permittee assumes all responsibility for damages to the work or structure herein authorized, and for damage caused by it or by his work in connection therewith to passing vessels or other craft, and that he shall not attempt in any way to prevent free use by the public of the area at or adjacent to the work or structure. 8. That if future operations by the Tinted States require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the Secretary of War, it shall cause unreasonable obstruction to the free navigation of said water, the permittee will be required, upon due notice from the Secretary of War, to remove or alter the structural work or obstuctions caused thereby without expense to the United States so as to lender navigation reasonably free, easy, and unobstructed: and if, upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed, the pennittce, at his own expense, and to such extent and in such time and manner as the Secretary of War may require, shall remove all or any portion of the uncompleted structure or fill and restore to its former condition the navigable capacity of the watercourse. No claim shall he made against the United States on account of any such removal or alteration. 9. That there shall be installed and maintained on the work, by and at the expense of the permittee, such lights and signals as may be prescribed by the Bureau of Lighthouses, Department of Commerce. 10. That the permittee shall notify the said engineer officer at what time the work will be commenced, and as far in advance of the time of commencement as the said engineer officer may specify, and shall also notify him promptly, in writing, of the commencement of work, suspension of work, if for a period of more than one week, resumption of work, and its completion. 11. That if the structure or work herein authorized- is not completed and written notice of completion is not filed with the aforesaid -engineer -officer on- or before the ----- day of ,191 , this authorisation, if not - previously revoked ~++i* KiM*fli4i<*ttllv ^xtfTMM^o rtlijill (*c{tm* finn oo inill jinii void. 11. Thftt tim iam stall t» 1*0X17 motiI bate* tbm floods of 191T. Witness my hand this ' ' -- day uf_______g 0 j j_____, 191* |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |