OCR Text |
Show THE ALL-AMERICAN CAXAL. 95 Structures: 24-foot siphon spillway for operation with power plant No. I1.............V.............................. $88,740 47-foot siphon spillway for operation with power plant No. 2............................................. 96,100 Turnout.............................................. 14,000 Check............................................... 11, 000 Drop................................................ 28, 000 Turnout............................................. 10,000 Wasteway at Alamo River............................ 44,000 Check................................................ 9,000 Flume across Alamo River............................ 116,000 Turnout............................................. 700 Check................................................ 9,500 Drop................................................ 26,500 Turnout............................................. 5, 500 Turnout............................................. 18,000 Check................................................ 5,700 Drop................................................ 8, 500 Drop................................................ 14,000 Wasteway at New River.............................. 130,000 Check................................................ 4,000 Flume across New River............................. 781,000 Turnout............................................. 6,000 Check................................................ 4,000 Drop................................................ 8, 500 5 highway bridges near Calexico....................... 52,500 Highway bridge, station 2350......................... 21,000 Highway bridge, station 2690......................... 14,000 Railroad bridge at Calexico............................ 15, 500 Right of way......................................... 125,000 66 miles of telephone line............................. 14,850 Total.............................................. 1,681,590 15 per cent contingency............................... 252,238 --------------- $1,933,828 Grand total................................................... 19,768,005 Estimate for construction of all-American canal of capacity to serve the Imperial Irrigation District with 1,600 second-feet additional capacity for Yuma project doxbn^td^siphon drop (7,600 to 1,500 second-feet). RECAPITULATION. Laguna Dam to siphon drop........................................... $4,186, 647 Siphon drop to Araz.................................................. 1,289,869 Araz to upper power site, Pilot Knob................................... 709,019 Upper power site to Pilot Knob........................................ 1,083, 576 Pilot Knob to west-side main canal.................................... 19, 768,005 Total.......................................................... 27,037,116 1 Constructed for full development as far as possible. Will cost about same as though built full height |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |