OCR Text |
Show 460 INTERNATIONAL TREATIES including the contributions from all the unmeasured tributaries, which are those not named in this Article, between Fort Quitman and the lowest major international storage dam. In the event of extraordinary drought or serious accident to the hydraulic systems on the measured Mexican tributaries, making it difficult for Mexico to make available the run-off of 350,000 acre-feet (431,721,000 cubic meters) annually, allotted in subparagraph (c) of paragraph B of this Article to the United States as the minimum contribution from the aforesaid Mexican tributaries, any deficiencies existing at the end of the aforesaid five-year cycle shall be made up in the following five-year cycle with water from the said measured tributaries. Whenever the conservation capacities assigned to the United States in at least two of the major international reservoirs, including the highest major reservoir, are filled with waters belonging to the United States, a cycle of five years shall be considered as terminated and all debits fully paid, whereupon a new five-year cycle shall commence. ARTICLE 5 The two Governments agree to construct jointly, through their respective Sections of the Commission, the following works in the main channel of the Rio Grande (Rio Bravo) : I. The dams required for the conservation, storage and regulation of the greatest quantity of the annual flow of the river in a way to ensure the continuance of existing uses and the development of the greatest number of feasible projects, within the limits imposed by the water allotments specified. II. The dams and other joint works required for the diversion of the flow of the Rio Grande (Rio Bravo). One of the storage dams shall be constructed in the section between Santa Helena Canyon and the mouth of the Pecos River; one in the section between Eagle Pass and Laredo, Texas (Piedras Negras and Nuevo Laredo in Mexico); and a third in the section between Laredo and Roma, Texas (Nuevo Laredo and San Pedro de Roma in Mexico). One or more of the stipulated dams may be omitted, and others than those enumerated may be built, in either case as may be determined by the Commission, subject to the approval of the two Governments. In planning the construction of such dams the Commission shall determine: (a) The most feasible sites; (b) The maximum feasible reservoir capacity at each site; (c) The conservation capacity required by each country at each site, taking into consideration the amount and regimen of its allot- ment of water and its contemplated uses; (d) The capacity required for retention of silt; (e) The capacity required for flood control. The conservation and silt capacities of each reservoir shall be as- signed to each country in the same proportion as the capacities required by each country in such reservoir for conservation purposes. Each country shall have an undivided interest in the flood control capacity of each reservoir. |