OCR Text |
Show 90 THE ALL-AMERICAN CANAL. Estimate for construction of all-American canal of capacity to serve the Imperial Irrigation District and additional mesa lands tcith 1,600 second-feet additional capacity for Yumu project down to siphon drop (10,600 to 1,500 second-feet). DIVISION" OP COSTS 1. Between the Yuma project for power development and the Imperial Irrigation District, including the new lands: Laguna Dam to siphon drop............................ $5,00S, 794 Siphon drop to Araz................................... 1,358, 869 ---------------§6,367, 663 Less connection with Laguna Dam (estimated under contract Oct. 23, 1918)............................................ 1,900,000 Amount, to be apportioned between the Yuma project and the Imperial Irrigation District.................................. 4,467, 663 For the Yuma project, two-ninths (contract Oct. 23,1918). 992,814 For the Imperial Irrigation District, seven-ninths (contract Oct. 23, 1918)................................. 3,474,849 -------------- 4,467,663 2. Between the Imperial Irrigation District and the new lands: Laguna Dam to Araz (seven-ninths above).............. 3,474,849 Connection with Laguna Dam (above).................. 1,900,000 Araz to upper power site (Pilot Knob).................... 811, 645 Upper power site to Pilot Knob......................... 1,469, 976 Pilot Knob to east-side mesa canal No. 1................ 17,066, 747 ---------------24, 723,217 60 per cent apportioned to Imperial Irrigation {District.. 14,833,930 40 per cent apportioned to new lands.................. 9,889,287 -------------- 24,723,217 East-side mesa canal No. 1 to mesa canal No. 2.................... 600,168 93$ per cent apportioned to Imperial Irrigation District.. 560,157 6f per cent apportioned to new lands.............___ 40, Oil --------------- 600,168 3. Summation of costs to different interests: The Yuma project................................................ 992,814 The Imperial Irrigation District- 60 per cent apportioned above..................... 14,833,930 93J per cent apportioned above..................... 560,157 Mesa canal No. 2 to west-side main canal............... 3,238,892 -------------- 18,632,979 The new lands- 40 per cent apportioned above.................... - 9,889,287 6f per cent apportioned above..................... 40,011 -------------- 9,929,298 Total...................................................... 29,555,091 |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |