| OCR Text |
Show b Volume Ia & lb contains a general overview of demolition projects Volumes II through IX contain information specific to demolition contracts Volume Xa & Xb contains information specific to asbestos and asbestos abatement activities on an area basis Volume Xia & Xlb contains information regarding waste inventories and disposal documents on an area basis - Volume Xa - Arthur and Magna Areas - Removal of asbestos - containing material in Administration uilding in En ine se and Back Shops. Estimated 865 sq ft of asbestos, 1600 linear ft of asbestos. 1sposal Site: Iron County Landfill, 69 South 100 East, Parowan, UT. Power Master Inc. 7 Bags (425 pounds) to Waste Control Management, 8000 West 1300 South, SLC 84044, 6/7/91. Magna Concentrator - Warehouse, Machine Shop, Boiler Shop, Carpenter Shop Lumber Shop. Asbestos estimates: Warehouse 1040 sq ft & 280 lineal ft; Machine Shop 846 lineal ft; Boiler Shop 80 lineal ft; Carpenter Shop; 360 lineal ft; Lumber Shop 12 sq ft. Disposal Site: Iron County Landfill, Cedar City, UT. Rocmont Industrial Corporation. \ I 141 bags asbestos Iron County Landfill. Dated 1/15/90 Arthur Administration Bldg 800 linear ft; Arthur Assay Lab 420 linear ft; Arthur Carpenter Shop 400 linear ft; Arthur Boiler Shop 150 linear ft; Magna Old Flotation Building 400 linear ft. 8/30/89 770 bags ACM to Salt Lake County Landfill, 4/14/89 Residences owned by Kennecott, 2343 South 8000 West, 2345 West 8000 West, total 1014 sq ft asbestos plus pick up 100 linear ft asbestos from Lark Facility. peformed in 9/91(?). 5 Bags asbestos to Waste Control Management, 8000 West 1300 South, SLC 84044, 7/29/91. Smelter Area Contract No. 8051. Removal of Asbestos Heat Insulation Converter Buiilding Annex and Reverb Bypass Flue May 1990. Rocmont Industrial Corporation Acid Plant# 5 scheduled 10/2/89 to 12/15/89. Estimated 11,000 sq ft and 100 linear ft. Disposal Site: Iron County Landfill, Cedar City, UT. 12/12/89 Salt lake County Landfill, 5600 W 1700 S, SLC. Acid Plant# 5. Asbestos containing |