| OCR Text |
Show Volume Ia & lb contains a general overview of demolition projects Volumes II through IX contain information specific to demolition contracts Volume Xa & Xb contains information specific to asbestos and asbestos abatement activities on an area basis Volume Xla & XIb contains information regarding waste inventories and disposal documents on an area basis Volume V - Kennecott Demolition- Egg Crate Building and Auxiliary Structures - Contract No. 8218 Dismantle Old Concentrate Storage/Blenomg acility - Smelter Rehabilitation Project 2/91 Macay-Kim, Inc.Co"fltra'cti Clean-Up PCBs / E r te Building - 1) Manifest a lies to contaminated solids including soil, absorbent and visqueen. - 2) Manifest applies to 10 gal of askarel oil drained from transformers subsequent to the spill. Manifests not legible. Appears to have been sent to USPCI Grayback Mtn Facility in Clive UT. There are three additional manifests with related PCB waste sent to USPCI Grayback Mtn Facility, Clive UT. 6/17/91 USPCI Grayback Mtn Facility in Clive UT. 327 PCB Capacitors removal from plate treater substation. 3916 PCB Oil <50 ppm 6/27/91 USPCI Grayback Mtn Facility. 7456 PCB Oil< 50 ppm Bills of Lading - USPCI Grassy Mtn Facility, Clive UT, Poisonous (Arsenic and Lead Compounds) 6/24/91 36,200 6/25/91 39,700 7/2/91 45,430 7/3/91 47,950 7/5/91 47,360 7/5/91 47,400 7/8/91 51,800 7/9/91 31,680 7/10/91 32,920 7/10/91 36,860 7/11/91 30,900 7/11/91 40,260 7/12/91 28,900 7/12/91 38,880 7/15/91 36514 7/15/91 41,780 7/15/91 ? |