| OCR Text |
Show lfJ Volume Ia & lb contains a general overview of demolition projects Volumes II through IX contain information specific to demolition contracts Volume Xa & Xb contains information specific to asbestos and asbestos abatement activities on an area basis Volume Xia & XIb contains information regarding waste inventories and disp[ osal documents on an area basis Volume VIIa &VIIb (Folder 1 & Folder 2) Arthur Concentrator and Old Smelter Structures Contract No. 8808 with SPN Dismantling June 28, 1988. Other than friable asbestos, no potentially hazardous material to leave the site??? 7/6/89, 12000 THW 2100 S, Magna UT 81044, ACM Smelter 30 cu yd, Load 036 Some concerns expressed in correspondence about the questionable nature and amounts of materials (soil, brick, iron scrap, etc.) that SPN Dismantling has transported to the Smelter Landfill. Some construction debris disposed at tailing pond landfill. Flue dust disposal? Letter dated 1/19/90 JBR Consultants to Mike Olsen, Kennecott stimates or off-site disposal: Brick generated during demolition of reverb flue 5,000 tons. Brick, demolition debris, flue dust in reverb bottoms 12,985 tons. Flue dust contaminated soil (to 1 ft) around hillside flue 11,775 tons Flue dust contaminated soil (to 1 ft) around converter, anode, reverb, retreater bldgs 37,584 tons |