| OCR Text |
Show BONNEVILLE UNIT DATA SUMMARY Project Water Irrigation Municipal and Industrial Stream Fish Total - Project Lands (Acres) Uinta Basin Bonneville Basin Sevier River Basin Total Full Service 0 29,370 0 29,370 207,500 acre-feet 99,000 acre-feet 6,500 acre-feet 313,000 acre-feet Supplemental Service 26,450 86,340 100,380 213,170 Total 26,450 115,710 100,380 242,540 -Project Features Dams and Reservoirs Starvation Upper Stillwater Currant Creek Soldier Creek Syar Sixth Water Hayes Mona Jordanelle Lampton Lower Stillwater Bottle Hollow (Dam and Dike) Dikes Provo Bay Goshen Bay Canals and Conduits Strawberry Wasatch Mona-Nephi Nephi-Sevier Elberta Jordan Aqueduct System Provo Bay Canal Powerplants Syar Sixth Water Dyne Total Height (feet) 155 199 130 251 88 150 200 48 292 68 72 5 7 , 6 9 & 11 24 30 36.8 m 32.0 m 24.4 m 27.1 m 12.9 m 20.8 m 11.6 mi iles 'les iles iles "les iles iles Installed Capacity (kw) 10,500 90,000 33,000 133,500 Length (feet) 2,920 2,700 1,600 1,290 3,240 590 1,870 550 2,480 2,250 1,810 475, 590, 780 7.2 miles 5.4 miles 285-620 sec-ft 200-175 sec-ft 190-25 sec-ft 150 sec-ft 130-25 sec-ft 270-80 sec-ft 100-20 sec-ft Capacity (acre-feet) 167,300 34,550 15,500 1,106,500 930 1,020 51,500 47,000 320,000 48,000 12,460 11,100 Normal Elevation (feet) 5712 8154 7678 7602 7185 6385 5150 4894 6166 4358 7297 5106 Design Head (feet) 332 770 800 1,902 Average Annual Energy Production (1,000 kw-hrs) 53,100 134,000 132,400 319,500 Construction Began March 1967 Estimated Cost (January 1963 prices) $ 324,000,000 CUWCD 3-75 |