OCR Text |
Show 20.61 feet; length 110,000 feet; grade 0.0826 feet per 1,000 feet; materials of construction Earth, rock and Earth, rock, timber, etc. concrete (b) Pipe lines: Diameter..............inches; length............ feet; grade................feet per 1,000 feet; total fall from intake to outlet................feet; kind........................................ Riveted steel, cement, wood-stave, etc. Note.-If a combination of different sizes or kinds of conduit is to be used, attach extra sheets with complete description, also show location of each clearly on map. 9. The estimated capacity of the diversion works proposed is 15,000 cubic feet per second State cubic feet per second or gallons per minute The estimated cost of the diversion works proposed is $6,100,000 Give only cost of intake, or headworks, pumps, storage reservoirs and main conduits described herein Completion Schedule 10. Construction work w44i begin within Started July, 1934 months after approval ei application. Construction work will be completed within 5 years after approval of this application. The water will be completely applied to the proposed use within 20 years after approval of this application. Description of Proposed Use Pilot Knob Po. H. 11. Place of Use. A Within NW% of SW% of Sec. 25, T 16 S,R 21 E, S. B. M. State 40-acre subdivisions of the public land survey. If area is unsurveyed indicate the location as if lines of the public land survey were projected. In the case of irrigation use state the number of acres to be irrigated in each 40-acre tract, if space |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |