OCR Text |
Show 4 1 have such control and supervision over the construction of 2 project works by the licensee, including location of con-8 stniction camp sites and facilities, as may be necessary, in 4 his judgment, to prevent, the licensee from interfering with 5 the Secretary of the Interior in the construction or operation 6 of the darn and incidental works, or with another licensee in 7 the construction or operation of project works. 8 " (f) The use is hereby authorized of such public and 9 reserved lands of the United States as the Secretary of the 10 Interior shall determine to be necessary or convenient for 11 the construction, operation, and maintenance of main trans- 12 mission lines to transmit electrical energy generated in 13 accordance with the provisions of this Act. 14 " (g) After the repayments to the United States of 15 all money advanced, with interest, charges shall be on such 16 basis and the revenues derived therefrom shall be disposed 17 of as may be hereafter prescribed by the Congress. 18 " (h) No person shall have or be entitled to the use 19 for any purpose of the water stored in the reservoir except 20 by contract made or permit or license granted as herein 21 provided." 22 Page 21, line 24, strike out "plant,"; 23 Page 22, line 2, strike out all after " same " through 24 line 10, and insert in Hen thereof a comma and "except a* 25 otherwise provided in this Act": |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |