| OCR Text |
Show later than thre (3) days prior to ny off-site shipment of hazardous substances and/or hazardous wastes from t.ha-. Site for disposal, Respondent shall provide written notification to the appropriate state environmental official in the receiving state and to the EPA Project Coordinator of such shipment. '26. a. No This notification shall be in writing, and shall (1) the name and include the following information: hazardous the which location of the facility to be to are wastes or substances shipped; (2) the type or wastes to substances hazardous the of and quantity be shipped; (3) the expected schedule for the shipment; the method of transportation. Respondent notify the receiving state of major changes in the shipment plan, such as a decision to ship the hazardous substances or wastes to another facility within the same state, or to a facility in another (4) and, shall state. b. identity of the receiving facility will be determined by Respondent. Respondent shall provide all relevant information, including the information noted above, as soon as practical after a decision is reached, but in no event later than specified in this The IX. Section MODIFICATION X. WORK OF any time before termination of this Order, Respondent identifies a need for additional data, Respondent shall submit a memorandum documenting the need for additional data to the EPA Project Coordinator within seven (7) days of such 27. at If, identification. the it additional will EPA, data in will its be discretion, will determine whether by' Respondent and whether collected incorporated into deliverables. be In the event of unanticipated or changed circumstances Site, Respondent shall notify the EPA Project Coordinator by telephone within 24 hours of discovery of the unanticipated or If the unanticipated or changed changed circumstances. 28. at the human health or welfare and the state that the immediate threat or the unanticipated or changed circumstances warrant changes in the Work to be performed, EPA may modify or amend the Work accordingly or take other actions authorized by CERCLA or the NCP. Respondent shall perform the Work as modified or amended. circumstances pose an immediate environment, Respondent If EPA determines immediately. or the EPA 29. defined in the objectives of this Order. threat shall to notify EPA may determine that Work in addition to tasks Work Plan may be necessary to accomplish the the removal action as set forth in Section V of EPA may require that the 1 1 Respondent perform such |