| OCR Text |
Show the Site as Respondents. described The Work above will be implemented by Plan must include at a minimum the the following elements: SELECTED RESPONSE ACTION AND SITE DESCRIPTION, A. Describe the EPA approved Removal action with. a short overview of the tasks required to implement the Removal. Also provide a des.cription of the Site relating specific This areas the elements of the response action. to section must address the physical characteristics of the for the' channel and design required engineering The Work Plan must include a restoration of the channel. digitized copy (for computer)" and graphic presentation of The Respondents current surveyed channel cross sections. must coordinate with EPA bef'ore obtaining the channel cross sections to detennine the location and interval requirements for those measurements. \- MATERIALS HANDLING AND STORAGE a. . Methods of materials handling for contaminated soils, clean soils, and stabilized soils (if reauired) must be include methods and shall This. section desc'ribed for excavation, on-site,. transportation' equipment temporary stockpiling, and final placement of stabilized material (if required). Maps depicting access routes, stockpile areas, work areas,. etc , shall be provided. .. \ c. DISPOSAL FACILITY \ disposal facility is used to meet' the of the response act-ion, the plan shall list,. If' an on- site the name and, location of the facility. repository is selected, the design specifications and construction QA/QC plans' must be submitted in the Work The EPA shall have final approval of the use o'f the Plan. If an off-site requirements proposed disposal facility. D. TRANSP'ORTATION' Transportation of contaminated material to the reposito and the routes for hauling off-site borrow material· is' to This section shall discUss the types of vehicles, routing and load limits Primary and alternate from the Site to the routing disposal facility shall be of the route shall be attached. listed.' Maps Any· shall be obtained'from.the required permits appropriate agency. Appropriate traffic' control measures· must .be for during hauling activities. provided be addressed. •. . . 6 |