Show EPA Docket No. CERCLA-VIII-95-04 with the following provisions, including but not limited to all attachments to this Order, and all documents incorporated by reference into this Order, and perform the following actions: 31. Designation of Contractor Kennecott shall notify EPA of and qualifications of any contractors or subcontractors to be used in carrying out Work under this Order either within fifteen (15) days after the effective date of this Order, or at least fifteen (15) days prior to any work being performed under this Order. EPA retains the right to disapprove of any, or all, of the contractors and/or subcontractors retained by Kennecott, but must have a good faith basis for such disapproval which must be stated in a written notice to Kennecott. If EPA disapproves of a selected contractor, Kennecott shall notify EPA of the identity and qualifications of any replacement within ten days of the names selection. 32. EPA and Kennecott shall each Coordinator. a. designae their own Project Project Coordinator EPA's and . Coordinator designated On-Scene is: Steven Way On-Scene Coordinator EPA Region VIII (EPR-ER) 18th Street Suite 80202-2466 Denver, CO (303) 312-6&08 999 b. - Kennecott's William R. Diector, Kennecott 3595 500 Project Coordinator is: Williams Health, Safety and Environmental Quality Corporation Utah Copper South 8315 West 84004-6001 Magna, Utah (801) 252-3110 or Fax (801)252-3083 The Project Coordinators shall be responsible for the implementation of this Order. EPA and Kennecott each have the right to change their respective Project The parties shall notify the other of Coordinator. any change in their Project Coordinator. The initial notification may be de orally, but it shall be followed promptly by a written notice with the name, title, address, and telephone number of the new Project EPA retains the right to Coordinator. disapprove of any Project Coordinator named by Kennecott, for good cause .. 33. overseeing - 9 |