| OCR Text |
Show ,/ into clean areas must be implemented and after demobilization. L. during construction ARARs Respondent must specify in the ork Plan how the applicable or relevant and appropriate requirements will be complied with during and after the implementation of The the Removal action. M. REPORTING AND DOCUMENTATION l. WEEKLY REPORTS • In addition the to weekly reporting specified in the weekly reports submitted to. the EPA must also detail Site activities, volumes of'materials excavated, Order, stockpiled, volumes of materials of volumes materials. r.equired) transporeed off-site, and any injuries/acci,dents onsite. Additional reporting will be ·made ediately volumes of materials stabilized (if , . available in the -event; of an emergency or deviation from the Removal Work Plan. Confirmation soil sampling, results must be summarized and reported also. 2. FINA,L REPORT A final . report. detailing all majo. tasks and critical and depths associated with materials excavated; stabilized, transported and placed in storage' shall be submitted to EPA 60 days after' completion of all'work on the Site., The report shall detail all confirmation samples taken on-site and the analytical data from t-he sampling. Long term erosion protection/monitoring shall also be addressed' in 'the final report. An engineering survey of the channel, ·must also be provided in graphic and digitized formats for conditions before and after the implementation of:" the action. In response addition, photograph;c' documentation of the final channel construction must be' provided in the report data regarding volumes, area .. .. IV. Sample Analysis Plan (SAP) Respondents will develop a site specific Sampling and The individual sections, as outlined Analysis Plan (SAP). The SAP 'must be belOW,' mUst be addressed in the SAP. submitted to EPA for conunent and approval as part of the Work The SAP shall be applicable to all phases of work Plan. performed tinder the Order. The SAP must include the following The 9· |