| OCR Text |
Show EPA Docket No. CERCLA-vm-93-tO 33 •. 7 All Work shall be conducted and completed in accordance with CERCLA, the NCP, EPA guidance, and any amendments thereto which· become effective prior to. the date of' completion of Work under this Order. Respondencs shall be identifying and using other guidelines, information that may be appropriate for responsible for policies, procedures, performing the Work. and 3. Activities undertaken by Respondents shall be in compliance with all other Federal, State, and local :laws and regulations, including permit requirements, unless an exemption is provided by Section 121{e) of CERCLA, 42 U.S.C. § 9621(e). Respondents shall identify all permits, licenses, and approvals which may be required for performance of the Work in sufficient time to obtain such permit, license or 'approval, where not exempt under CERCLA, and to perform Work as scheduled. Respondents shall perform all Work in a high-quality Deliverables shall be edited for content, organization, Failure to grammar, and spelling before submittal,to EPA. perform or prepare Work of high quality shall be considered a violation of this Order. 35. manner. . 36. Respondents shall employ sound scientific, engineering, and construction practices in performing Work pursuant to this' All tasks performed shal be under. the direction and Order. supervision of alified personnel or contractors with experience in the types,of tass required for implementation of the Work. Respondents shall provide a copy of this Order and any relevant· modifications to this Order to any. contractor retained or hired' to perform any Work and shall condition the. performance of Work on compliance with the relevnt requirements of this Order. before the effective date of this Order, notify EPA,' in writing, of the name, title, and of 'the personnel and contractors. to be used in qualifications the Work. out Respondents shall demonstrate to. EPA that carrying and contractors possess the qualifications, proposed personnel technical and capability, management capability experience, necessary to perform the Work in a safe and timely manner, consistent with the requirements of'this Order. I£ EPA disapproves of any personnel or contractor, Respondents shall. within fourteen (14) days submit the name of another'person or contractor and the information outlined above. Any change in personnel or' contractor' performing Work under this Order shall be submitted, with the information outlined above, to'EPA for approval at least seven (7) days before Respondents make such 37'. On or. Respondents shall change. . |