Show Work includes required the characterizing source area contamination, and it includes obtaining sufficient geologic, and to information design If for on-Site disposal. off-Site disposal is necessary, then it shall be consistent with section III.C below. Existing data that are valid and of also It useable' quality be sufficient. requires may implementing the response action consistent with CERCLA, the and geotechnical hydrologic construct the appropriate landfill NCP an this Order. The Respondent shall prepare and submit for EPA approval a Work Plan describing in detail how the Respondent shall removal action, how the work will be performed, the implement action criteria such as depth of removal' and response' methods as appropriate, schedules and personnel Landfill 'Design In a and addition, responsil:>ilities. EPA will Construction Specifications report will be required. prepare an Action 'Memorandum specifying the Removal action treatment selected for the Site. & Health Site Safety plan shall be prepared by the Respondent for activities conducted by tlie Respondent, the contractors and during representatives Respondent's of work. implementation A III. REMOVAL WORK PLAN Respondent shall prepare and submit a draft Work Plan The work days at the effective date of the Order. must include at a minimum the elements: following plan The within 45 RESPONSE ACTION SELECTED A. Describe the response action with a short overview of the tasks required to implement the Removal. A schedule of activities must also be included. MATERIALS B. . HANDLING AND STORAGE Methods of materials handling for contaminated soils, clean soils, and stabilized soils (if required) must be described. This shall and section include methods for demolition, excavation, transportation on equipment Site, temporary stockpiling, and (if required). stabilized material routes, work t.o'ckpd.Le areas, FACILITY (Off-Site s final placement of Maps depicting haul areas, etc.,. shall' be . provided. C. DISPOSAL If an off-Site response or On-Site) disposal facility is the plan shall action, 3 a requirement list the of name the and |