| OCR Text |
Show EPA Docket No. CERCLA-VIII-95-04 submit shall receipt of a revised draft Work Plan within fifteen (15) notification of the required revisions. days of EPA's shall implement the Work Plan as finally approved in in accordance with the schedule approved by EPA. writing by Once approved, or approved with modifications, the Work Plan, the schedule, and any subsequent modifications shall be fuliy enforceable under this Order. Kennecott EPA 39. Design and Construction and Construction Plans for Design with the attached SOW, Schedule. Quality Assurance 40. and Kennecott at a date Plans; Kennecott shall submit the repository, in accordance to be determined in the Project Sampling shall assure that all sampling and analyses this Order shall conform to EPA direction, performed pursuant approval and guidance regarding sampling, qualj..ty assurance/quality control (IIQA/QC"), data validation, chain of custody procedures, the requirements of this Order and the approved Kennecott shall ensure. that any Sampling and Analysis Plan. laboratories used to perform analyses participate in a QA/QC program that complies with relevant EPA guidance. Upon request by EPA, Kennecott shall have the laboratory it uses analyze samples submitted by PA for quality-assurance monitoring. Kennecott shall provide EPA with.copies of' the QA/QC procedures followed by all sampling teams and laboratories performing data· collection or analysis if such procedures differ from the approved Sampling and Kennecott shall Analysis Plan of Quality Assurance Project Plan. allow EPA or its authorized representatives to take split samples of any samples collected by Kennecott while performing work under Kenne.cott shall notify EPA not less than two this Order. days in advance of any sample collection activity. EPA shall have the· right to take any additional samples that it deems necessary. to Reporting 41. Kennecott describing actions shall submit a written progress report to EPA undertaken pursuant to this Order and its management reports verifying - contractor work as follows: on the second working day of every week after the effective date of this Order during removal activities; and on the second working day of every month during the planning activities, unless. otherwise directed by the Project Coordinator. These reports shall describe all activities listed in the attached SOW as well as significant developments during the preceding period, including: actions performed and any problems encountered, analytical data received during the reporting period, developments the next reporting period, a schedule of 11 anticipated during actions to be performed, |