| OCR Text |
Show , Site described The Work Respondents. elements: following the A. as SELECTED RESPONSE above Plan be will implemented by include at a minimum must ACTION AND SITE the the, DESCRIPTION Describe the EPA approved Removal act.Lon with a short overview of the tasks required to implement the Removal. Also provide a description of the Site relating specific This of the elements the areas to response action. section must address the physical characteristics of the for the channel and required design engineering The Work Plan must include a restoration of the channel. digitized copy (for computer)', and graphic presentation of surveyed channel cross sections. The Respondents coordinate with EPA before obtaining the channel sections to determine the location and interval cross requirements for those measurements. current must B . MATERIALS HANDLING AND STORAGE materials handling for contaminated soils, clean soils, and stabilized soils (if required) must be and methods include shall This, section d.escribed. Methods of for on-site, excavation, transportation temporary stockpiling, and final placement of stabilized material (if required). Maps depicting access routes" equipment c. work areas, stockpile areas, DISPOSAL FACILITY etc., shall be provided. off-site disposal facility is used to meet the requirements' of the response action,' the plan shall list If an on- site the name and location of the, facility. the is selected, design specifications and repository be submitted in. the Work must construction'QA/.QC plans The EPA shall have final approval of the use of the Plan. If an proposed disposal facility. D. TRANSPORTATION' Transportation of contaminated material to the repository and the routes for hauling off-site borrow material is to be addressed. This section shall discuss the types of ,Primary and alternate disposal facility shall be vehicles, routing and load limits. routing listed. required agency. provided the Site to the attached. shall be route the of Any' 'pennits shall be obtained from the appropriate Appropriate traffic control measures must be for during hauling activities. from Maps 6 |