OCR Text |
Show bigbee River. At Allatoona Dam an additional 36,000-kilowatt unit is authorized for installation at some future time. Total authorized electric power generating facilities in the basin will provide 335,000 kilowatts of additional installed capacity. (See table 2.) TABLE 2.-Undeveloped hydroelectric power possibilities 1 This total does not include the possible Fort Stoddard project across the Mobile River or its equivalent by modification of the Glaibome navigation site on the Alabama River with connecting canal to a dam on the Tombigbee River, the second major tributary of the Mobile River. This project, if found economically feasible, could provide an installation of 180,000 kilowatts. 535 Ultimate Average Active Project River installed annual gen- storage capacity eration capacity 7,000 Development authored but not under 1fiw KUowatt. 1,000 construction Kilowatts hours Acre-feet Howell Mill Shoals................. Coosa........................... 99 348,000 300 Jones Bluff......................... Alabama......................... 100 465,000............ Millers Ferry............................do.......................... 100 472, 000 .......... Total.......................................................... 299 1,285,000 300 Addition to Allatoona plant............................................ 36 ........................ Total authorized power.......................................... 335 1,285,000 300 Other projects to complete the ultimate plan now envisioned Montgomery...................... Alabama........................ 80 398,000 155 Wallahatchie....................... Tallapoosa....................... 36 118,000 ............ Emuckfaw..............................do.......................... 96 329, 000 1, 445 Crooked Creek..........................do.......................... 44 185,000 340 Oakfuskee..............................do.......................... 16 56,000 730 Hatchet Creek...................... Hatchet Creek.................... 18 53,000 380 Waxahatchee....................... Waxahatchee..................... 2.6 8,000 59 Patlay............................. Coosa........................... 54 229,000 170 Murry Cross............................do.......................... 32 133,000 70 Terrapin........................... Terrapin Creek................... 2.6 10,000 20 Little River........................ Little River...................... 14.5 46,000 33 Mills Creek........................ Mills Creek....................... 4.6 12,000 102 Sewell Ferry....................... Coosa........................... 24 99,000 50 Kingston.......................... Etowah.......................... 26 106,000 125 Canton.................................do.......................... 11.4 42, 000 ............ Gilmer Ferry............................do.......................... 30 68, 000 700 Armuchee......................... Oostanaula....................... 24 99,000 345 Tails Creek........................ Coosawattee...................... 56 228,000 180 Cartecay.......................... Cartecay......................... 10.5 29,000 160 Tilton............................. Conasauga....................... 10 41,000 430 [acks River.............................do.......................... 5.8 17,000 98 Total 21 other projects........................................... 598 2, 306,000 5,592 Total additions to existing private plants............................................................. 374.7 960,000 353 Total undeveloped power at 24 projects, including additions to and re-developments of existing plants........................................ 1, 307. 7 4, 551, 000 6, 245 Total potential power at 31 plants....................................... 1, 800 6,718, 000 * 7, 996 |