| OCR Text |
Show CALVERT CLIFFS' COORD. COM Cite as 449 1 United States v. Oregon, 366 U.S. 643, 648, 81 S.Ct. 1278, 1281, 6 L.Ed.2d 575 (1961). (Footnotes omitted.) It is, after all, the plain language of the statute which all the members of both houses of Congress must approve or disapprove. The courts should not allow that language to be significantly undercut. In cases such as this one, the most we should do to interpret clear statutory wording is to see that the overriding purpose behind the wording supports its plain meaning. We have done that here. And we conclude that Section 104 of NEPA does not permit the sort of total abdication of responsibility practiced by the Atomic Energy Commission. v. UNITED STATES A. E. COM'N H27 Petitioners' final attack is on the Commission's rules governing a particular set of nuclear facilities: those for which construction permits were granted without consideration of environmental issues, but for which operating licenses have yet to be issued. These facilities, still in varying stages of construction, include the one of most immediate concern to one of the petitioners: the Calvert Cliffs nuclear power plant on Chesapeake Bay in Maryland. The Commission's rules recognize that the granting of a construction permit before NEPA's effective date does not justify bland inattention to environmental consequences until the operating license proceedings, perhaps far in the future. The rules require that measures be taken now for environmental protection. Specifically, the Commission has provided for three such measures during the pre-operating license stage. First, it has required that a condition be added to all construction permits, "whenever issued," which would oblige the holders of the permits to observe all applicable environmental standards imposed by federal or state law. Second, it has required permit holders to submit their own environmental report on the facility under con- 41. 10 C.F.R. § 50, App. D, H1I 1. 14. 2d 1109 (1971) struction. And third, it has initiated procedures for the drafting of its staff's "detailed environmental statement" in advance of operating license proceedings. 41 The one thing the Commission has refused to do is take any independent action based upon the material in the environmental reports and "detailed statements." Whatever environmental damage the reports and statements may reveal, the Commission will allow construction to proceed on the original plans. It will not even consider requiring alterations in those plans (beyond compliance with external standards which would be binding in any event), though the "detailed statements" must contain an analysis of possible alternatives and may suggest relatively inexpensive but highly beneficial changes. Moreover, the Commission has, as a blanket policy, refused to consider the possibility of temporarily halting construction in particular cases pending a full study of a facility's environmental impact. It has also refused to weigh the pros and cons of "backfitting" for particular facilities (alteration of already constructed portions of the facilities in order to incorporate new technological developments designed to protect the environment). Thus reports and statements will be produced, but nothing will be done with them. Once again, the Commission seems to believe that the mere drafting and filing of papers is enough to satisfy NEPA. The Commission appears to recognize the severe limitation which its rules impose on environmental protection. Yet it argues that full NEPA consideration of alternatives and independent action would cause too much delay at the pre-operating license stage. It justifies its rules as the most that is "practicable, in the light of environmental needs and 'other essential considerations of national policy'." *2 It cites, in particular, the "national power crisis" as a considera- 42. Brief for respondents in No. 24,871 at 59. |