| Title |
Central Utah Water Conservancy District repayment contract, Bonneville Unit, Central Utah Project |
| Description |
Documents and correspondence mostly concerning the repayment contract for the Bonneville Unit of the Central Utah Project; from the The Dorothy Harvey papers (1902-2005), a collection of materials focusing on the Central Utah Project (CUP), a water resource development program to use Utah's alloted share of the Colorado River. Includes correspondence, federal documents, project litigation materials, subject files. |
| Subject |
Central Utah Project. Bonneville Unit; Colorado River Storage Project (U.S.); Ute Indians--Claims; Water resources development--Environmental aspects--Utah; Natural resources--Environmental aspects--Utah; Natural resources--Management--Utah; Strawberry Aqueduct; Water-supply--Utah--Salt Lake County |
| Contributor |
Clyde, Edward W.; Carlson, Peter; Higginson, R. Keith; Ludlow, Lynn S.; Plummer, N. W.; Raskin, David C. |
| Additional Information |
Includes: Letters concerning the Central Utah Water Conservancy District repayment contract; Letters from the Environmental Policy Center, Water and Power Resources Service, the Sierra Club; Dept. of the Interior news release: New agreement provides for greater instream flow on Utah's Bonneville Unit; Excerpt from Dept of Interior Semiannual Report on Operation of the Office of Inspector General for the 6-month Period Ended March 31, 1979; Memo on Contracts and Agreements Under the Central Utah Project, Utah; Draft of the Supplemental Repayment Contract Between the United States of America and the Central Utah Water Conservancy District, Utah; Memo on Options and Recommendations for Increasing Repayment Obligation, Bonneville Unit, Central Utah Project; Critical Analysis: Bonneville Unit, Central Utah Project a Bureau of Reclamation Water Development Project |
| Spatial Coverage |
Salt Lake County (Utah); Uinta Mountains (Utah and Wyo.); Strawberry Reservoir (Utah); Strawberry River (Utah); Currant Creek (Utah); Duchesne River (Utah); Rock Creek (Utah); West Jordan (Utah); Utah Lake (Utah); Spanish Fork River (Utah); Jordanelle Reservoir (Utah); Provo River (Utah); Jordan River (Utah); Starvation Reservoir (Utah); Diamond Fork (Utah); Colorado River Watershed (Colo.-Mexico); Bonneville Basin (Utah); Uinta Basin (Utah and Colo.) |
| Collection Number and Name |
Accn2232 Bx118 Fd3; Dorothy Harvey papers |
| Rights Management |
Digital Image © 2010 University of Utah. All Rights Reserved. |
| Holding Institution |
J. Willard Marriott Library, University of Utah |
| Date |
1969; 1970; 1979; 1980; 1981 |
| Digitization Specifications |
Original scanned on Epson Expression 10000 XL and saved as 400 ppi TIFF. Display image generated in Contentdm. |
| Publisher |
Digitized by J. Willard Marriott Library, University of Utah |
| Type |
Text |
| ARK |
ark:/87278/s64748tr |
| Setname |
wwdl_neh |
| ID |
1155692 |
| Reference URL |
https://collections.lib.utah.edu/ark:/87278/s64748tr |
| Title |
Page 30 |
| Setname |
wwdl_neh |
| ID |
1155566 |
| OCR Text |
Show fe If it is decided not to oppose the bill, ve recomrar.d that certain provisions bo included in the bill to protect the interests of the Central Utah Project. The bill should contain stipulations reserving the ri^nt of the Uater and Power ;loeourccs Service to construct, reconstruct, operate, and jviintain dikes and appurtetiant facilities in connection with the Central Utah Project cr any other Service project, together vith the rf^ht of ir.-jrcss and caress over the subject lands on mutually acceptable routes. The Service should also have the rir,ht to conduct any survey, naterials, ^colo-.ic, water quality, biological, environmental or other investigation activity related to the Central Utah or any. | other Service project. pQk ' ' ' The construction of the dike for the proposed Provo City access road to the airport should be coordinated with the Service to insure that elevations arc the s.nr.e for the access road dike as for the juroposcd Provo liay Dike. • . ' ' . • • • If the relinquished land3 are Ponneville Unit lands to have been developed by the dikin-; of Provo Uay and these land3 arc now developed by the city rather than und^r the Ilcnnevillc Unit, any pum^o;* cost involved should continue to DO the responsibility of the city after Provo i'*ay is diked unh-r the ^reject. Uonncville Unit should | not be obligated to nr.sume the rvampin ; responsibility for land;; which | become "non-project' ax a result o: the city dev-. Icpmcnt. 1 I It should also be pointed out that the description in the bill has i been checked in this office an! errors have been discovered. In t order to insure that the description in the hill is accurate, Provo I City should -urovirle an accurate survey, includinr; reestablishr.ent of I the Utah Lake meander line in the area covered by the bill. | The city should also be nvnro* .that it wLli he responsible for J resolving any environmental impacts caused by its proposed action. k P. KH Carpenter be: Regional Solicitor, Salt Like City, Utah |
| Reference URL |
https://collections.lib.utah.edu/ark:/87278/s64748tr/1155566 |