OCR Text |
Show TABLE 6.-Tentative allocation of costs, Corps of Engineers projects, October 1950 [Thousands of dollars] Project Estimated cost Reimbursable allocations of cost Power Irrigation Total Flood con- trol and navigation cost Completed or under construction Fort Peck dam *............................. Garrison Dam *............................. Oahe Dam *................................ Big Bend Dam 1............................. Fort Randall Dam *......................... Gavins Point Dam *......................... Kanopolis Dam 2............................ Cherry Creek Dam *......................... Harlan County Dam 2....................... Agricultural levees........................... Kansas Cities............................... Other flood protection....................... Navigation channel.......................... Subtotal............................... Authorized but not under construction Pioneer Darn *.............................. Red Willow Dam 8.......................... Tuttle Creek Dam »......................... Pomme de Terre Dam 8...................... Richland Dam 8............................. Rich Fountain Dam 8........................ Other flood protection....................... Subtotal............................... Projects recommended for authorization in Yellowstone River Basin...................... South Plattc River Basin4.................... Elkhorn River Basin......................... Little Nemaha River Basin.................... Nemaha River Basin......................... Chariton River Basin........................ Osage River Basin........................... Little Missouri River Basin................... Subtotal............................... Grand total............................ 136,900 222, 250 258, 200 43, 024 187, 040 43, 725 12,167 15, 700 49, 897 119,700 41, 389 23, 203 218, 200 1, 371, 395 14, 952 9,540 68,164 18, 884 25, 594 30, 900 8,304 176,338 7,220 51, 440 3,205 10, 838 23, 437 17,501 191,217 171 305, 029 1, 852,762 59, 025 115,695 133, 355 42, 824 105, 965 35, 885 35, 250 46, 410 53,190 35, 970 1,352 14, 000 94, 275 162, 105 186, 545 42, 824 141, 935 35, 885 1,352 14, 000 492, 749 186,172 678, 921 3,720 3,720 3,500 9,726 14, 200 3,500 9,726 14, 200 27, 426 3,720 31,146 42, 625 60,145 71,655 200 45,105 7,840 10,815 15, 700 35, 897 119,700 41,389 23, 203 218,200 692, 474 14, 952 5,820 68,164 15,384 15, 868 16,700 8,304 145,192 7,220 51, 440 3,205 10, 838 23, 437 17, 501 191,217 171 305, 029 520,175 189, 892 710, 067 1,142, 695 1 Tentative allocation based on Corps exploratory cost allocation prepared for use of the Bureau of the Budget. 2 Allocation based on storage allocation. 8 Allocation based on ratio of benefits. 4 Chatfield Reservoir, included in this group, is now au- thorized for construction. 189 |