| OCR Text |
Show P:hm. =#= 1]- Four Horse Barn: 1. One window is out on the north side of the loft. Z. Guides are needed at all doors, The doors are free to move wi th the wind, swinging back and forth. 3. The easrb side of this building needs additional paint. 4. The apron board under the loft doors ha$ been torn off. This should be repaired. 5. The roof of this building lis to be painted. Plam. =11= ffil- Office: 1. The pdnt job on this building is no'C hr Iding up too good. It is suggested that one more coat of paint be applied to the south side and such other places as are peeling off. Z. Porch steps sould be constructed to serve this building. :Sa The inside floor s,."'ould be cleaned carefully with "vater and naptha. Following this treatment, it should be oiled, vsnrnished, and waxed. 4. The stove pipe should be covered with an asbestos jacket. 5. The toilet seat should be varnished. The toilet tank lid ha$ a chip broken out of it. If this can be found, it sllOuld be cemented back/ in place. The chL~ey is plastered and not covered vuth wallboard, and is considered safe. The inside painting is to acceptable st8li~dard. The rear room of this building should be tidied. The roof of this building is to be painted. (Sgd) Geo. L. Nichols Ai; E. |