Show The chimney and the flue connections of t is building were checked mnd they are believed to be safe, except as was referred to under #a,#3, mnd # 4 a.bove. The plumbing, other than the water filter, is in satisfactory repair. The roof of t his building s,1. ould be painted. Plan # Zl: 1. The eas.t side of ].!ilint. this building should be ~iv.en one coat of a. There are four clips short on the hanger and track to the 1arte rolling doorSi. These should be ~dded or the track will bend and make it impossible for one . person to open and shut the doors;. The track mnd hanger should be tiled and greased. 3',. Concrete steps are needed at the small doors to make access to the building easy and safe. The chimney of t his building was checked and is considered safe. Thr roof of this building is to be painted. E.9;,uip:nent Shed:: (Truck Trail Handbook Plan -1 ) 1. The doors of this building need base glilidea. Z. The door hangers need adjustment. The doors must be fixed properly or they will blow off. They need blocking at the ends and guides to hold them, as mentioned under # 1 above. 3. This building needs one more coat of paint. It is suggested that we cut on the aJITlount of nile green used on the aoors. Do not paint the crosses on the doors nile green, '.,:.a./$ they ]Look too conspicuous. 4. The shavings and waste materials in this building should be clea.ned up:. They are a considerable fire hazard. 5. There is a windowbroken on the south side of this building. This should be replaced. The roof of t his building is to be painted. |