OCR Text |
Show CALIFORNIA DEFENDANTS Identification: Exhibit No. 524 ............ Admitted: July 5, 1957 SCHEDULE SHOWING COST OF WORKS CONSTRUCTED BY SAN DIEGO COUNTY WATER AUTHORITY TO UTILIZE COLORADO RIVER WATER. A. Cost of Works Constructed to Utilize Colorado River Water to November 30, 1956.________________________________________ San Diego Aqueduct (Contract NOy-13300) First Barrel $14,407,643.37 Second Barrel 16,125,014.86 $30,532,658.23 Less Metropolitan Water District portion: First Barrel 7,203,821.68 Second Barrel 8,275,626.91 15,479,448.59 $15,053,209.64 Plus Other Authority Direct Costs: Preliminary Investigations: Bureau of Reclamation (Contract 176r500) 55,122.44 Authority 10,609.31 65,731.75 Plans and specifications: Bureau of Reclamation (Contract 176r701) 100,000.00 Special election 66,787.35 Co-operative work with Bureau of Reclamation and U. S. Navy 21,611.72 Metering stations 85,622.78 Access roads 14,058.07 Adaptation of Navy Construction 29,676.90 Miscellaneous 5,934.53 389,423.10 Sub Total (San Diego Aqueduct) 15,442,632.74 La Mesa-Sweetwater Extension 1,459,568.55 Fallbrook-Oceanside Branch 833,978.10 Buildings and equipment 88,143.33 Construction work in progress 374,900.02 Total cost of works $18,199,222.74 |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |