OCR Text |
Show -11- (e) Water deliveries to the California Water and Telephone Company are carried from the Lakeside Control Station through 62,355 feet of 27, 24, and 18-inch concrete pipe, and discharged into the Sweetwater Reservoir. (f) The cost for construction of the La Mesa-Sweetwater Branch as of November 30, 1956 totals $1,459,568. E. Description, Physical Data and Financial Expenditures by the San Diego County Water Authority for Proposed Second San Diego Aqueduct, as of May 1, 1957. 1. Definition The Second San Diego Aqueduct as now proposed will consist of a canal and pipe line extending from the Metropolitan Water District Colorado River Aqueduct, in the vicinity of San Jacinto in Riverside County to Otay Reservoir, located on Otay River about eight miles east of Chula Vista, in San Diego County. The northerly 43.5 miles to a point 5.9 miles south of the Riverside-San Diego County line will be financed and constructed by the metropolitan Water District as part of its expansion program. The remaining portion, totaling 61.1 miles, will be financed and constructed by the San Diego County Water Authority. 2. Location The aqueduct will generally follow the route of the First Aqueduct in Riverside County. The two aqueducts will be close together through Rainbow Pass in northerly San Diego County. From there south, the aqueduct will lie westerly of the First Aqueduct, a distance of about six miles, passing west of Hodges |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |