OCR Text |
Show -10- (c) Length-84,729 feet (16.2 miles). (d) Construction Completed-In 1948. (e) Description-Steel pipe 16 inches in diameter for the first 31,973 feet, to Fallbrook Control Station, at which point water deliveries to Fall-brook-Oceanside are metered. Oceanside water is carried from Fallbrook Station to the Ocean-side water system, a total of 52,756 feet, through a 14-inch concrete pipe. (f) Cost-The cost as of November 30, 1956 for the construction of the Fallbrook-Oceanside Branch totals $833,978. D. Description, Physical Data and Costs of the La Mesa-Sweet water Branch, as of November 30, 1956. (a) La Mesa-Sweetwater Branch is defined as the construction from an outlet on the San Diego Aqueduct at Slaughterhouse Canyon-5 miles north of Lakeside-to the Sweetwater Reservoir of the California Water and Telephone Company, located on the Sweetwater River about 10 miles easterly of the Pacific Ocean. (b) Location-Extending from Slaughterhouse Diversion Structure on San Diego Aqueduct to Sweetwater Reservoir on Sweetwater River. (c) Length-87,177 feet,-equals 16.5 miles. (d) Description-Single pipe line with diameter varying from 48 to 39 inches for the first 24,-798 feet, to Lakeside Control Station, at which point deliveries are made to the Lakeside Irrigation District, California Water and Telephone Company (agent for the South Bay Irrigation District and National City), and the Helix Irrigation District. |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |