OCR Text |
Show 6125 4125 that time is indicated by a line, which is indicated No. 1, November, 1924. The second measurement of that series plotted on this sheet ( indicating) was made September 11, 1925, and is shown on the cross- section as a line dated September, 1925. It will be noted that at Station 250, the lines for these two cross- sections ( indicating) indicate that at station 230 feet from the right bank, that particular portion of the river bed was the name; at station 200, the measurement made in Septem-ber, 1925, was a approximately a foot and four- tenths above the bed of the river, as shown by the measurement made in 1924, indicating at station 200 a fill of 1.4 feet. Going to the section river of the lying to the right of 250 station, between 250 and 500, the cross- sections indicate a scour throughout with a maximum of about three feet at station 375. Taking another typical example, the change in the cross-section shown between May 12, 1926, and May 30, 1926, these tables ( indicating) indicate a scour throughout maintained to out the greater portion of the bed of the river. The maximum change in the bed of the river, as shown by these measurement, is between measurement made November, |