OCR Text |
Show Table C- 24 ( Continued) Summary of Average Annual Man- days of Fishing Associated with Streams Affected by the Bonneville Unit 1/ 2/ Without the With the Net Unit Unit Change Section of Stream ( miles 3/) ^ man- days) ( miles 3/) ( man- days) ( man- day; Currant Creek Reservoir in Currant Creek Reservoir Site 1.5 600 0.0 0 - 601 Currant Creek downstream from Currant Creek Reservoir 22.0 9,400 22.0 900 - 8,51 Layout Creek downstream from Layout Diversion Dam : 2.0 200 2.0 0 - 201 Water Hollow Creek downstream from Water Hollow Diversion Dam 5.0 300 5.0 0 - 30< Strawberry River in Strawberry Reservoir Enlargement Site 7.0 6,800 0.0 0 - 6,800 Strawberry River between Soldier Creek Dam and Starvation Reservoir 30.0 14,700 30.0 3,000 - 11,700 Strawberry River in Starvation Reservoir Site 7.0 200 0.0 0 - 201 Strawberry River downstream from Starvation Reservoir 4.0 100 4.0 0 - 10( Duchesne River from mouth of Hades Creek to Knight Diversion Dam 35.0 18,300 35.0 14,700 - 3,60( Note: Footnotes are found at the end of the table. 375 |