OCR Text |
Show CENTRAL UTAH PROJECT WATER IN UTAH LAKE Return flow Spanish Fork Aiea 8 adjacent areas- - 6,900 AF Return flow Utah County Municipal 16,800 A F Return flow Provo Bay 6,400 AF Direct flow project water for Provo River Exchange- 8,000 A. F For shortages11- ------------ 1,600 A. F Combined savings in consumptive use plus carry over in Jordanelle Reservoir - 109^ 300 A. F T0TK\ L 149,000 A. F USE FROM UTAH LAKE fflM*£ j* » *? ™ & Provo River Exchange-- ' 06,300 A. F Provo Bay Irrigation 24.200 A./ F Mosida Area iff, 500A. F Notes-. Data average for 1921- 60 period. All reservoir capacities are active storage, and are not drawn to scale Flow lines ore drawn approximately to scale. Project Power Plant Existing Power Plant -' Mean annual releases from Strawberry Reservoir to Utah Lake ro alleviate shortages In years of severe drought. FIGURE A- 15 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION CENTRAL UTAH PROJECT BONNEVILLE UNIT- UTAH WATER DISTRIBUTION BONNEVILLE BASIN HYDROLOGIC AREA Revised 3- 6- 73 DECEMBER, 1970 66- 418- 3325 |