OCR Text |
Show CALIFORNIA DEFENDANTS Exhibit No. 214 Identification: May 10, 1957 Admitted: May 10, 1957 ALL-AMERICAN CANAL: ASSIGNMENT OF CAPACITIES Section of Canal Main All-American Canal: Head works and canal to Siphon Drop Siphon Drop to Pilot Knob..................... Pilot Knob to Drop No. 1 (Coachella Canal turn-out)................ Drop No. 1 to end of canal...................... Total............................................................ Branch Canal to Coachella: Head (Drop No. 1) to end of Common Section (Sta. 2600)............. Sta. 2600 to end......................................... Total............................................................ Length in Miles Capacity in cubic feet per second Coachella Valley Imperial City of County Irrigation San Water Total District Diego District Yuma Project 14.7 5.9 15.5 44.2 15,155 13,155 10,155 7,755-2,655 11,500 11,500 8,500 7,600-2,500 155 155 155 155 1,500 1,500 1,500 12,000 80.3 49 70 2,500-1,500 1,500- 425 1,000- 0 1,500 1,500- 425 110 1Cost of capacity for Yuma Project is charged to other contractors. Yuma Project pays cost of turn-out structures only. NOTE: Imperial Dam is a part of the Ail-American Canal and also serves the Gila Project in Arizona (2,200 cubic feet per second). |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |