OCR Text |
Show -30- Estimated Cost of Completing 60,000 Acres on the Colorado River Irrigation Project in the State of Arizona (Costs as of November 1956)* Diversion Dam Alteration $ 4,960 Main Canal 660,000 Lateral System 5,525,000 Drainage Works: 30 miles ditch 324,000 Tile for 12,000 acres 1,295,000 Bridges Farm Access drain 93.5 section 12 x 50 = 800 x 5 - $4,000 404,000 Levees 8 miles @ 13,000 113,000 Riprap 54,000 Floodway 13,500 Roads-2 mi. per section 93.5 sec. x 2 = 187 miles 2,020,000 Highway Bridges 50 each $9,000 486,000 Subtotal $10,899,460 Land Development Clearing 60,000x35.00 2,360,000 Grading 60,000x1,000 9,720,000 Fine Grade 60,000 x 12.50 810,000 Farm Ditches 93.5x4=374 miles Use 500 at 5,000 2,700,000 Subtotal $15,590,000 Total $26,489,460 *Some of the extensions shown on this table and the following tables appear to be in error. The tables are reproduced as they appear in the original exhibit which was supplied by the Bureau of Indian Affairs. [Note by California defendants.] |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : |