OCR Text |
Show Feeder. (See photographs, Plates 1, 11, 12, 15 and 19.) (c) Total Cost as of January 31, 1944-Exclusive of Lake Mathews and Morris Dam and Reservoir, the total cost of all pipelines, connections, reservoirs and other facilities was approximately $27,642,479. B. Specific Description and Physical Data of the Distribution System of the Colorado River Aqueduct Project, as of January 31, 1944. 1. Lake Mathews (Caljalco Reservoir) and Appurtenant Works: (a) Location-10 miles southwest of Riverside, California. This reservoir is the terminus of the main aqueduct and beginning of M.W.D. distribution system. (b) Description-see photograph, Plate 1, showing portion of Lake Mathews. (c) Construction-completed February 11, 1938. (d) Function-receives water from main aqueduct, and by means of a headworks structure controls the flow and pressure of water released from Lake Mathews into the M.W.D. distribution system. (e) Capacity-total 107,000 acre-feet; maximum usable storage of 103,680 acre-feet. (f) Cost-$5,911,700. (g) Delivers water to: |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |