OCR Text |
Show -28- California. Its function is to provide additional water storage for the distribution system and is the principal feature of the Middle Feeder System. Construction on this reservoir was commenced October 22, 1952, and completed October 11, 1954. As of November 30, 1956, the total cost of construction of Garvey Reservoir was $6,312,049. (See photograph, Plate 21.) (b) Pipeline-33.6 miles of pipeline consisting of the Middle Feeder, the Ascot-Garvey Cross Feeder, the Victoria-223rd Street Cross Feeder, and the Middle Cross Feeder and Inglewood Lateral. Except for the 20-mile LaVerne-Garvey pipeline, the Middle Feeder System is complete. 4. On the Lower Feeder System: (a) Pipeline-approximately 19 miles of the ultimate 46 miles of the Lower Feeder extending from Lake Mathews westerly to the Middle Feeder. Traveling westerly the first feature of completed construction is: (b) Cajalco Tunnel-This 1.4-mile, 10-foot diameter tunnel extends westerly from the headworks at Lake Mathews. Construction on this tunnel was completed November 1, 1954, at a total cost of $1,598,808. Continuing westerly the construction of the Lower Feeder is complete 8.5 miles through the City of Corona across the Santa Ana River Canyon to the east portal of: (c) San Juan Tunnel-This 1.3-mile, 10-foot diameter tunnel is located on the Lower Feeder west of the Santa Ana River Canyon. Construction on this tunnel was completed January 10, 1956, at |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |