OCR Text |
Show 5948 3951 200 feet of relief. Q Of what? A 200 feet of relief; that is, we estimated the ele-cation at the junction to be so high, or so much, and we started out survey approximately 250 feet in elevation above that point, to show where the flat water would be. Q Now far up did you run the contours? A Up the river? Q No, I mean the elevation. A Well, at the upper end of the survey it was the water surface, and at the proposed dam site it was 200 feet above -- 225, or something like that. Q Who else was in that party? A Well, Sawyer was in charge of the survey, and Mr. Richardson was in charge of the work, and we had seven or eight other men. Q What was your particular employment with that party? A Plane table operator; instrument man. Q Did you have any boats? A Yes, sir |