OCR Text |
Show -5- F-2. Please provide citations to engineering reports which reasonably describe each of the projects and works listed in the answer to question F-l and state where a copy of each is available for public inspection. (If possible, please provide copies.) [Answer by Arizona dated March 15, 1956.] F-2. The numbers used in this answer refer to each project listed in the answer to F-l. The place where a copy is available for inspection appears in parentheses after the description of each document. 1. Engineering Report on Plans and Cost Estimates of the First Unit, Gila Project, Arizona, December, 1934 (Bureau of Reclamation, Washington, D.C.). Report of Feasibility of Gila Valley Project, Arizona, February, 1936, by Special Committee (Bureau of Reclamation, Washington, D.C.). 2. Project Planning Report No. 3-8b.l-0, September, 1945 (Bureau of Reclamation, Washington, D.C.). 3. Project Planning Report No. 3-8b.9, April, 1946 (Bureau of Reclamation, Washington, D.C.). 4. Hearings, Sub-Committee on Irrigation and Reclamation, U.S. Senate, 78th Congress, on S. Res. 304 (U.S. Senate, Washington, D.C.). 5. Senate Document No. 142, 67th Congress, p. 61 (U.S. Senate, Washington, D.C.). 6. Plans of Office of Indian Affairs (Office of Indian Affiairs, Washington, D.C.). 7. Senate Document No. 142, 67th Congress, p. 50 (U.S. Senate, Washington, D.C.). |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : California exhibits. |